TEAM OF PRE ENGINEERED BUILDINGS are discuss in this post. The PEB System is growing rapidly in almost all parts of the world. The use of PEB is highly economical and Eco friendly. By the application of this we can save natural resources.
For this a proper planning requires with good ideas. These ideas proceeds by engineers.
The designs made by PEB manufacturer. They use the best raw materials. And makes a wide range of structural design.
The efficient design of PEB is lighter than normal steel buildings. This reduce the steel consumption. And saves cost.
At erection, many process carry out for protecting materials. And to take care of members. And to make a safe and fast erection to reduce construction time and cost.
TEAM OF PRE ENGINEERED BUILDINGS
A team involves to construct and finish these works.
- Project Manager
- Project Engineer
- Quality Engineer
- Site Engineer
- Safety Officer
- Erection In-charge
- Erection Team
- Team Leader
1. Project Manager
He is in-charge of total area of construction site. It is his responsibility to take control of all over the site. And to guide the team working under him.
2.Project Engineer
He is a support and behalf of Project Manager. He makes schedule of works as per project managers plan. And to maintain technical documentations like Erection Drawings, Letters, data sheets, etc. And to sought out technical mistakes.
3. Quality Engineer
He is the responsible for quality. The main work is to make site Quality assurance and control. And to check the incoming materials, conducting tests.
Conducting inspections and giving clearance for site engineers to work. And to identify the defects like pinholes, potholes, cracks, damages in PEB and to rectify it.
4. Site Engineer
He is responsible for work process. Site Engineer have to make method statements, Checklists, Daily progress reports. And to get quality control checklists, documents signed from Quality Engineer.
5. Safety Officer
He conduct safety training, makes checklists. He takes care of entire team to work in a safe way.
6. Erection In-charge
He has to to make sure that the work process is in line with plan & schedule. And work with safety.
7. Erection Team
They have to follow strict instructions of higher officers. And work properly.
8. Team Leader
Team Leader leads the team. And they supervise all the labors.